1

Detailed Notes on earthing system testing

News Discuss 
Use thimbles and nut bolts to tightly hook up wires into the bed plates of devices. Each equipment need to be earthed from two different destinations, as well as minimum length involving two earth electrodes need to be ten ft (3m). Rod earthing will involve the usage of a steel https://cynochat.com/read-blog/167949

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story