Budgets which have filters usually are not now supported in cost analysis. You don't see them within the checklist. Budgets on decrease-stage scopes are not shown in cost analysis these days. To check out a funds for a selected scope, change scope using the scope picker. Tradeoff: Ongoing performance optimizations https://azurecostoptimisation28518.canariblogs.com/the-best-side-of-azure-cost-optimization-45694052