To realize the buck/Improve feature, all of that is needed is 2 separate switches so that the AC enter can be linked to on the list of two Main faucets, though the load is linked to the opposite, As a result using the major transformer's Principal windings being an autotransformer. https://cesarwhqwc.wssblogs.com/33755104/5-tips-about-ups-you-can-use-today